Water tank waterproofing

Water tank waterproofing in Al Zuhour, Jeddah

Al Zuhour is a newly developing neighbourhood in north Jeddah, where ongoing construction and cleared plots mean construction dust enters tank openings regularly. Fine particles from grading work and incomplete roads settle on rooftop surfaces and find their way into tank fittings through rain spray or ventilation gaps. Waterproofing seals the tank before debris accumulation accelerates corrosion.

  • Interior surfaces fully sealed
  • Food-safe coating materials
  • Cracks and gaps filled first
  • Inspected before handover

Why tank waterproofing protects your water supply

The neighbourhood lies on the edge of new urban expansion near Obhur Al Shamaliyah, served by main arterial roads, surrounded by land still under development and active construction.

  • Seal before a leak develops

    Tank corners and seams begin cracking in newly settled ground, and external dust accumulates on rim edges, allowing moisture to enter through these pathways once construction dust settles.

  • Repair an existing slow drip

    Cleaning must be thorough in Al Zuhour because fine construction particles settle slowly and bond to walls, requiring deep scrubbing before the coating can adhere properly to bare concrete.

  • Keep drinking water free of debris

    Strong summer heat on new building rooftops opens hairline cracks at seams, and waterproofing shields the tank interior from water seeping inward through these expanding gaps.

  • Reduce maintenance over time

    A new tank in a developing area can be maintained through regular inspection rather than replacement, provided it is sealed before heavy contaminant buildup begins.

Everything included in the service

  1. Tank drained of water

    Tank drained of water

  2. Walls scrubbed with brush

    Walls scrubbed with brush

  3. Surfaces dried before coating

    Surfaces dried before coating

  4. Cracks and gaps sealed

    Cracks and gaps sealed

  5. Primer coat brushed on

    Primer coat brushed on

  6. Waterproofing coat brushed on

    Waterproofing coat brushed on

  7. Second coat applied over first

    Second coat applied over first

  8. Coating inspected before leaving

    Coating inspected before leaving

How the waterproofing job is carried out

  1. Booking and access arrangement

  2. Draining, cleaning, and drying

  3. Sealing and coating

  4. Inspection and handover

What changes about water tank waterproofing in Al Zuhour

Fine construction particles settle constantly on exterior surfaces and ledges, reaching tank openings and roof fixtures especially on afternoons when winds from cleared land blow across the neighbourhood. For the whole method, see how we approach water tank waterproofing.

  • The first reason

    Construction dust accumulates in new tank openings

    Incomplete streets and newly graded land in Al Zuhour generate fine dust continuously. This settles on tank rim edges and fittings, falling into the tank with rain spray or condensation. Particles accumulate in the base and provide a substrate for algae growth, turning stored water turbid within weeks of dust settling.

  • The second reason

    Newly laid foundations move as ground settles

    New buildings in this neighbourhood rest on foundations made after land preparation only months before occupancy. Early ground settlement causes slight building movement, opening hairline cracks at tank corners and seams. Waterproofing applied early seals these joints before seeping begins, preventing the need for costly repairs as the structure shifts.

  • The third reason

    High humidity from water spraying during construction

    Surrounding buildings under construction spray water continuously for concrete curing and dust suppression. This raises atmospheric humidity sharply during the day. High moisture accelerates chemical corrosion of concrete and mortar, making tank walls porous from inside within months if left uncoated.

The character of Al Zuhour

New development: ongoing construction and vacant plots between the homes

In a newly developing area, new tank components have not weathered long-term exposure, but relentless construction dust accelerates their deterioration rapidly. Early sealing protects the tank from this debris before it becomes embedded and causes permanent water quality problems.

What the tank looks like after

A sealed, smooth interior surface

The coating bonds to the concrete or fibreglass and fills any hairline cracks that were present.

No active leaks or seeping

Gaps that were allowing water to seep through the walls or base are filled and covered.

Food-safe lining throughout

Every applied material is rated safe for contact with drinking water.

What our customers said

«شغلهم ما شاء الله، أنصح الجميع بالتعامل معهم. عن تجربة وثقة.»
Hesham ZayanAugust 2026 · Review on Google Maps
«أفضل شركة تنظيف بالبخار. أسعارهم ممتازة وشغلهم مرة كويس.»
Bashar Al-MushaikhiJuly 2026 · Review on Google Maps
«خدمة ممتازة.»
Abdullah Al-GhamdiAugust 2026 · Review on Google Maps
«ممتازين.»
Muhammad EshraJuly 2026 · Review on Google Maps

Read the reviews on Google

Some of our work

Sofa cleaning
Sofa cleaning
Carpet and rug cleaning
Carpet and rug cleaning
Villa cleaning
Villa cleaning
Majlis and rest-house cleaning
Majlis and rest-house cleaning
Kitchen cleaning
Kitchen cleaning
Chandelier cleaning
Chandelier cleaning
Bathroom cleaning
Bathroom cleaning
Mattress cleaning
Mattress cleaning
Office cleaning
Office cleaning
Hotel and resort cleaning
Hotel and resort cleaning
Shopping centre cleaning
Shopping centre cleaning
Marble grinding and crystal polishing
Marble grinding and crystal polishing

Illustrative photographs. Our own job photographs go here as soon as the client approves them.

What is different about North Jeddah

The northern sector of Jeddah is the city's newest ground: gated villa schemes, low apartment blocks and wide boulevards laid out over the last stretch of open land before Dhahban and Thuwal. Much of it is still being built, so construction dust from cleared plots and half finished streets is the defining problem, drifting across finished homes on the afternoon wind and settling as a pale grit on car ports and window ledges. Summer brings the heaviest of it, while the short winter rains turn the same dust into streaks down cladding and glass.

Nearby districts we cover

Questions worth asking first

Yes, because construction dust is continuous and enters the tank constantly. Early sealing prevents particles from settling in the base, where they trap moisture and trigger algae bloom. Waiting means removing thick settled layers and contamination before sealing, a harder and costlier process.

Ground that is newly graded and compacted is still moving for two to three years. The building shifts minutely, opening small cracks at corners and seams. Waterproofing applied before this settling prevents seeping; applied after it, the cracks may have already started weeping.

In Al Zuhour, external dust enters the tank far more rapidly, and humidity from surrounding construction sites is higher. Tanks need more frequent post-sealing inspection to ensure that construction dust does not enter through ventilation openings, and blocked openings may need replacement or cleaning more often.

Yes, even new tanks gather fine dust from grading and construction within weeks of filling. Deep cleaning ensures the coating adheres to bare concrete, not to a thin layer of fine particles that will fail under pressure and cause premature seeping.

The main arterial road carrying heavy traffic nearby lifts dust from exhaust and tyre wear. This dust penetrates windows and roof openings, and the rooftop tank is directly exposed. Sealing reduces the amount of road dust that settles inside, keeping water cleaner.

Inspect once in spring for dust blown during high winds, and once in autumn after construction activity peaks. Add inspection after any dust storm, because fine particles may penetrate through ventilation openings or loose tank covers despite the seal.

It is set after we see the job, because the price follows the kind of work, the size of the space, its condition and the time and materials it needs. Send a photo and a short description on WhatsApp and we will give you an estimate before we reach Al Zuhour.

The duration depends on the tank size and how long the interior needs to dry before coating.

No special preparation is needed on the household's side.

Need water tank waterproofing in Al Zuhour?

We reach Al Zuhour at a time we agree, and you get the full cost before we start.

Call WhatsApp